Match the lead-paint determination to the components being disturbed

Review the components, method, qualified tester and results supporting a lead-paint-free determination for an otherwise covered RRP renovation.

If a contractor says an otherwise covered renovation does not need the EPA RRP requirements because the affected paint is lead-free, ask for the basis and compare it with the actual work scope. Identify which painted components will be disturbed. A general statement about the house does not show whether the relevant windows, trim or other components were included in a qualified determination.

Section 745.82 describes exceptions involving specified determinations or testing of the affected components. Its provisions identify qualified inspectors or risk assessors, certified renovators using recognized methods, and the relevant laboratory route. Review the applicable branch with the responsible professional rather than treating every negative-looking test result as interchangeable.

Create a scope comparison with the planned component, room or location, report reference, test method, tester and recorded result. Ask the firm to identify the determination it relies on and the match to each affected component. Where the regulation calls for the firm to obtain a copy of the determination, confirm that the document is actually available to the firm doing the work.

For example, a report concerning painted doors may not identify window trim newly added to the project. Mark the additional component and ask the qualified firm to address it before the changed work proceeds. Do not rewrite the old report's description to make it appear that the extra surface was already tested. The record should preserve what was examined and when the scope changed.

EPA's 2026 renovation publication says the testing report must describe the test used, surfaces tested and results. It also distinguishes the testing routes and notes a difference for housing subject to HUD's Lead Safe Housing Rule. Tell the professional about federal assistance and ask about applicable state or tribal programs as well, so the review uses the requirements governing the actual property.

A home-age check, a paint-testing determination and certification of the renovation firm are separate pieces of the project assessment. If the record is incomplete, have the responsible professional resolve the treatment of the affected surfaces before relying on an exception. Keep the final scope and supporting report with the accepted proposal so the people scheduling the work use the same information.

The site shop offers project folders, scanners and labeling supplies for maintaining clear renovation records. Compare tools that keep component photographs and reports together, and choose storage suited to the documents the qualified project team provides.

Sources and further reading

This is general information. Check the relevant authority or manufacturer for the rules, compatibility and terms that apply to your situation.

More practical guides